Yesterday was the final day of demo work. We finished removing both bathrooms and the screen porch. The workers had a difficult time moving the tub to the first floor due to it being a 1/2" cast iron design but they did succeed without damaging anything. Well, at least I didn't see the damage if it exists.
Our formal architectural plans were approved yesterday and we have our building permit. Now we will move on to preparing the house for framing and painting. The upcoming week will include installation of the new HVAC system, repairing the termite damage, and patching and waterproofing the basement walls.
I am investigating some drywall options from Serious Materials (www.seriousmaterials.com) that have eco, soundproofing, and insulating qualities. Hopefully they will get back to me with a local dealer so that I can determine if it is cost effective.
Thursday I measured for new windows and began the process of getting quotes. With the majority of windows already replaced we will be spending less money on materials but a lot more on labor due to the poor initial installation. In the end, we will have a house full of dual pane, LowE glass windows that should help control energy costs.
Can't wait to see them in action.